Search
Advanced Search
GO
Sort Project List
By completion date
By project name
By location
By business unit
Industrial Projects
Page:
  • 1
  • 2
  • 3
List View
Gallery View
  • 1
  • 2

Fletcher built this specialist facility to house Pago Pago International Airport’s land and marine fire fighting appliances and the rescue crew’s administration, training and accommodation spaces.

  • 1
  • 2
  • 3
  • 4

This enormous distribution centre is the first automated handling facility of its kind in New Zealand, housing hi-tech conveyors, lifts and cranes that process hundreds of thousands of bottles and cans each day.

  • 1
  • 2
  • 3

Installation of a 1000-tonne coal-staker and reclaim system has substantially improved Lyttelton Port’s ability to load West Coast coal onto ships for export.

  • 1
  • 2
  • 3
  • 4

Marstel Terminals required construction of two chemical and nine non-dangerous storage tanks at its Port of Tauranga base. This required large-scale construction: each tank is 13m high, and the ...

  • 1
  • 2
  • 3

Construction of a deep water port capable of handling close to 3 million tonnes of cargo per annum at Northland’s Marsden Point featured pile driving of a kind not seen before in Australasia.

  • 1
  • 2
  • 3

Construction of a 180m long concrete wharf extension at Northland's Marsden Point required innovative temporary works to gain access for the installation of heavy steel driven piles and a concrete deck over the water.