The complete refurbishment and fitout of the original Seddon Tech Block B building was a highlight of the refurbishment and construction project linking historic and contemporary buildings at the Auckland Institute of Technology (AIT) – now the Auckland University of Technology (AUT).

  • 1
  • 2
  • 3
  • 4

The multi-faceted design poses many structural challenges.

  • 1
  • 2
  • 3
  • 4

Built to cater for 5,000 fulltime students at postgraduate and undergraduate level, the new 10-storey building has a minimalist interior layout and the latest wireless communication technologies.

  • 1
  • 2
  • 3
  • 4

Providing an additional 20,000m² of new facilities, AUT’s new Sir Paul Reeves Building at its Auckland City Campus provides a major gateway to AUT and has increased the campus area by 25%.

  • 1
  • 2
  • 3

Staged commencement dates for both levels were required, with level 4 being allocated only 11 weeks over the Christmas period from the commencement of demolition through to handover for AUT fit-out items.Specialised offshore materials were required and non-standard items were also sourced from within New Zealand.

  • 1
  • 2
  • 3
  • 4

The second stage of Fletcher Construction’s refurbishment to Levels 5-7 at AUT’s School of Art & Design included art and design studios, and a multitude of related facilities.